The Water and Wastewater Department in the County will be working to conduct repairs as result of a water service leak on Taylor Dr (Fenwood Gardens) on Friday, Aug 29, 2025.
Repairs will begin at 8am, with an expected completion of 5pm the same day.
Taylor Dr will be reduced to one lane in this area for the duration of the reapirs and traffic control will be in place. Motorists are asked to avoid the construction area and travel alternate routes if possible.
Heavy equipment may limit visibility in the area and noise levels will be elevated for the duration of the repair.
Repairs are localized are not expected to impacted water quality; however, services on Taylor Dr could experience intermittent pressure fluctuations including pressure loss and coloured water while work is taking place. The water remains safe to drink throughout the duration of construction.
For more information, contact the County of Prince Edward at 613.476.2148 extension 1023, 613.962.9108 extension 1023, orĀ info@pecounty.on.ca.


